team
Team
Gaurav Kalia
Director

Gaurav joined IDA in 2008 and has been involved in design development and construction of several airport projects with experience in all phases of design – from scheme design to detail design and construction documentation following with on-site support.

Gaurav started with IDA as on-site architect for Delhi International Airport Terminal 3, providing necessary support to Client during design development & construction phase. His role was to review the construction documents & contractor’s shop drawings, coordination with services and operations team and assisting Client in material selections.

Later in 2011, he moved to Hong Kong and worked on scheme design & detail design for Ibrahim Nasir International Airport (Maldives). He was responsible for developing design drawings for various tender packages and also coordinating with engineering consultants to develop the design for terminal building & ancillary buildings.

Later he worked on scheme design of Third Runway concourse (TRC) for Hong Kong International airport. His role was to develop terminal layouts in coordination with Stakeholder requirements along with systems coordination.

He is currently working on detail design for Mactan Cebu International airport, Philippines.

Before joining IDA, Gaurav was working with Larsen & Toubro (L&T) from 2006 as site architect for Hyderabad International Airport providing architectural & finishes support to the construction & execution team for Passenger terminal & ATC building.

Prior to joining L&T, Gaurav was practicing with architectural & interior firm in Hyderabad.